1、 Shandong braided hose Before winding, inner pipes shall be inspected one by one, and those that do not meet the process requirements shall be returned to the previous process for treatment.
2. The number of steel wires, winding stroke and winding outer diameter specified in Table 4 of Process Table 3 shall be strictly followed during winding.
3. When winding, the looper shall be wound at the same time to prevent uneven winding diameter caused by rubber driving and stacking.
4. The pay off tension of the bobbin shall be even, and the tension difference shall not be greater than 0.5N.
5. The left and right rotations shall be distinguished according to the pre sizing requirements when the wire is put on line. It is strictly prohibited to mix left and right rotations. The innermost winding layer adopts right rotations. The rotation direction of adjacent two winding layers shall be opposite.
6. Each winding layer shall adopt the corresponding mouth type, and it is strictly prohibited to substitute the splitter.
7. The traction pressure chain of the winding machine shall be properly tightened to prevent the inner tube from being damaged by excessive pressure.
8. The inner winding layer is not allowed to have broken wires and adhesive backing, and other winding layers are not allowed to have two or more broken wires. The winding layers should be arranged neatly. It is allowed to have a steel wire back strand in one stroke, and the unqualified part of the winding layer shall be marked with an invalid mark for removal during packaging.
9、 Shandong braided hose Wrap the end tightly with adhesive tape after each layer of winding, and ensure that the winding part can pass through the winding mouth and rubber coating mouth smoothly.
10. The wrapped rubber hose shall be neatly arranged on the bracket and covered with rubber for vulcanization within 48 hours.